THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HANOVER-LYME STP-X-0331(021), 13287 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: MARCH 25, 2004 SCOPE OF WORK: GUARDRAIL REMOVAL AND REPLACEMENT LOCATION: NH ROUTE 10 IN HANOVER AND LYME COMPLETION DATE: OCTOBER 1, 2004 A DELUCCA FENCE COMPANY, INC. FIVE OLD FERRY ROAD, METHUEN, MA 01844 $ 844,278.84 B CWS FENCE GUARDRAIL 18 TEN PENNY LANE, ANDOVER, NH 03216 $ 879,663.70 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LM 5,360. 3.09 16,562.40 4.10 21,976.00 203.1 COMMON EXCAVATION M3 40. 10.00 400.00 30.00 1,200.00 203.5552 GUARDRAIL ELT PLATFORM U 14. 1,410.00 19,740.00 1,200.00 16,800.00 203.5595 GUARDRAIL E-1 PLATFORMS LM 160.7 22.00 3,535.40 32.50 5,222.75 203.601 EMBANKMENT-IN-PLACE M3 300. 7.00 2,100.00 20.00 6,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING T 2,400. 28.20 67,680.00 25.00 60,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 280. 131.00 36,680.00 150.00 42,000.00 603.34104 375 MM STEEL END SECTION EA 9. 154.00 1,386.00 205.00 1,845.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 75. 68.00 5,100.00 102.00 7,650.00 604.32 DRAINAGE MANHOLES U 1. 2,690.00 2,690.00 2,200.00 2,200.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LM 40. 22.97 918.80 20.00 800.00 606.014 150 MM X 200 MM WOOD POST REPLACEMENTS FOR BEAM GUARDRAIL POSTS EA 20. 44.00 880.00 39.00 780.00 606.0142 150 MM X 200 MM WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 20. 8.00 160.00 7.00 140.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 6,675. 46.33 309,252.75 46.25 308,718.75 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LM 31. 65.16 2,019.96 58.00 1,798.00 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 45. 1,397.00 62,865.00 1,495.00 67,275.00 606.14531 BEAM GUARDRAIL (TERMINAL UNIT SPECIAL, 15.2 M) U 35. 1,680.00 58,800.00 1,730.00 60,550.00 606.14533 BEAM GUARDRAIL FOR STORAGE (TERMINAL UNIT SPECIAL, 15.2 M) U 6. 1,344.00 8,064.00 1,200.00 7,200.00 13287 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 524.00 1,572.00 482.00 1,446.00 606.1495 BEAM GUARDRAIL TERMINAL SECTION TYPE E-1) LM 160.7 68.90 11,072.23 65.00 10,445.50 609.811 BITUMINOUS CURB TYPE B (100 MM REVEAL) LM 1,430. 13.76 19,676.80 9.75 13,942.50 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 618.7 FLAGGERS HR 1,800. 9.00 16,200.00 11.00 19,800.00 619.1 MAINTENANCE OF TRAFFIC U 1. 24,211.00 24,211.00 28,383.00 28,383.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 300. 4.00 1,200.00 3.00 900.00 621.31 SINGLE DELINEATOR WITH POST EA 250. 26.00 6,500.00 23.00 5,750.00 645.531 SILT FENCE LM 4,750. 5.79 27,502.50 5.00 23,750.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 4,100.00 4,100.00 4,560.00 4,560.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 40. 56.00 2,240.00 15.00 600.00 646.317 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS, & HUMUS M2 4,400. 4.62 20,328.00 5.75 25,300.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 14. 118.00 1,652.00 140.00 1,960.00 692. MOBILIZATION U 1. 22,690.00 22,690.00 44,171.20 44,171.20 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 1,500.00 1,500.00 1,500.00 1,500.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 $844,278.84 $879,663.70