THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: GUARDRAIL REPAIRS TURNPIKE 14250 COUNTIES AND CODES: VARIES DATE BIDS OPEN: JULY 8, 2004 SCOPE OF WORK: GUARDRAIL REPAIRS LOCATION: VARIOUS LOCATIONS IN THE TURNPIKE SYSTEMS COMPLETION DATE: JUNE 30, 2006 A DELUCCA FENCE COMPANY, INC. FIVE OLD FERRY ROAD, METHUEN, MA 01844 $ 71,149.00 B CWS FENCE & GUARDRAIL 18 TEN PENNY LANE, ANDOVER, NH 03216 $ 76,025.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 600. 10.48 6,288.00 9.90 5,940.00 606.1403 BEAM GUARDRAIL (THRIE BEAM) INCLUDING TRANSITION SECTION LF 100. 15.34 1,534.00 18.15 1,815.00 606.1451 BEAM GUARDRAIL (TERMINAL UNIT TYPE (MELT)) U 2. 1,136.00 2,272.00 1,024.00 2,048.00 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 6. 1,298.00 7,788.00 1,297.00 7,782.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 284.00 568.00 275.00 550.00 606.1495 BEAM GUARDRAIL (TERMINAL SECTION TYPE E-1) LF 100. 16.71 1,671.00 16.20 1,620.00 606.21401 DOUBLE-FACED BEAM GUARDRAIL STANDARD SECTION W/ RUB RAIL LF 300. 27.76 8,328.00 24.00 7,200.00 606.21403 DOUBLE-FACED BEAM GUARDRAIL (THRIE BEAM) INCLUD. TRANS. SECTION LF 150. 27.76 4,164.00 30.60 4,590.00 606.2240 DOUBLE-FACED BEAM GUARDRAIL (THRIE BEAM) (CORROSION RESISTENT) LF 100. 33.16 3,316.00 41.60 4,160.00 606.240 CORROS.-RESIST. STEEL BEAM GUARDRAIL LF 100. 12.10 1,210.00 9.50 950.00 606.2452 CORROS.-RESIST. STEEL BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 2. 1,622.00 3,244.00 1,656.00 3,312.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 692. MOBILIZATION U 1. 3,383.00 3,383.00 4,900.00 4,900.00 692.19 MOBILIZATION AT NIGHT U 1. 4,383.00 4,383.00 8,158.00 8,158.00 14250 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 $71,149.00 $76,025.00