THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: GILSUM 13854 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: FEBRUARY 12, 2004 SCOPE OF WORK: GUARDRAIL REPLACEMENT AND OTHER INCIDENTAL WORK LOCATION: ON NH ROUTE 10 BEGINNING APPROXIMATELY 2.3 KILOMETERS (1.4 MILES) NORTH OF THE KEENE/GILSUM TOWN LINE AND CON- TINUING NORTH APPROXIMATELY 9.25 KILOMETERS (5.75 MILES) TO APPROXI- MATELY 402 METERS (1320 FEET) NORTH OF THE GILSUM/MARLOW TOWN LINE. COMPLETION DATE: OCTOBER 15, 2004 A CWS FENCE & GUARDRAIL 18 TEN PENNY LANE, ANDOVER, NH 03216 $ 653,931.50 B DELUCCA FENCE COMPANY, INC. FIVE OLD FERRY ROAD, METHUEN, MA 01844 $ 689,295.62 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.701 REMOVAL OF GUARDRAIL LM 4,700. 3.28 15,416.00 4.01 18,847.00 203.5552 GUARDRAIL ELT PLATFORM U 13. 1,000.00 13,000.00 500.00 6,500.00 203.5595 GUARDRAIL E-1 PLATFORM LM 300. 35.30 10,590.00 45.94 13,782.00 206.2 ROCK STRUCTURE EXCAVATION M3 50. 170.00 8,500.00 34.31 1,715.50 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING M3 1,700. 33.00 56,100.00 20.59 35,003.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 200. 75.00 15,000.00 115.77 23,154.00 563.301 BRIDGE RAIL T101 (MODIFIED) (F) LM 11.5 217.00 2,495.50 269.03 3,093.85 565.81 REHABILITATION OF BRIDGE APPROACH RAIL (F) LM 10. 343.00 3,430.00 288.72 2,887.20 585.3 STONE FILL, CLASS C M3 300. 33.00 9,900.00 28.83 8,649.00 593.21 LOW STRENGTH GEOTEXTILE, NON-WOVEN M2 1,200. 2.85 3,420.00 2.30 2,760.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 11. 245.00 2,695.00 210.00 2,310.00 604.85 WATER REPELLENT FOR EXISTING CB'S AND DI'S EA 11. 200.00 2,200.00 183.75 2,021.25 606.000 STEEL BEAM FOR BEAM GUARDRAIL LM 76. 17.50 1,330.00 13.13 997.88 606.014 150 MM X 200 MM WOOD POST REPLACEMENTS FOR BEAM GUARDRAIL POSTS EA 62. 35.00 2,170.00 39.00 2,418.00 13854 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.0142 150 MM X 200 MM WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 62. 7.00 434.00 5.00 310.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 4,950. 44.00 217,800.00 50.30 248,985.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LM 15.2 50.00 760.00 59.06 897.71 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 13. 1,388.00 18,044.00 1,644.00 21,372.00 606.14531 BEAM GUARDRAIL (TERMINAL UNIT SPECIAL, 15.2 M) U 12. 1,572.00 18,864.00 1,640.00 19,680.00 606.14532 BEAM GUARDRAIL (TERMINAL UNIT SPECIAL, 7.6 M) U 12. 1,150.00 13,800.00 1,540.00 18,480.00 606.14533 BEAM GUARDRAIL FOR STORAGE (TERMINAL UNIT SPECIAL, 15.2 M) U 2. 1,200.00 2,400.00 1,200.00 2,400.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 5. 462.00 2,310.00 466.00 2,330.00 606.1485 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 2. 938.00 1,876.00 890.00 1,780.00 606.1495 BEAM GUARDRAIL TERMINAL SECTION TYPE E-1) LM 280. 65.00 18,200.00 65.23 18,264.40 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 888.00 888.00 1,311.00 1,311.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LM 20. 32.80 656.00 51.45 1,029.00 609.5 RESET GRANITE CURB LM 25. 60.00 1,500.00 110.24 2,756.00 609.811 BITUMINOUS CURB TYPE B (100 MM REVEAL) LM 1,100. 10.00 11,000.00 15.65 17,215.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 618.7 FLAGGERS HR 1,000. 9.00 9,000.00 7.00 7,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 17,200.00 17,200.00 25,484.00 25,484.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 1,500.00 3,000.00 3,100.00 6,200.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 2. 400.00 800.00 458.00 916.00 619.273 TRAILER-MOUNTED SPEED LIMIT SIGN UWK 2. 100.00 200.00 445.00 890.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 340. 3.00 1,020.00 3.65 1,241.00 621.31 SINGLE DELINEATOR WITH POST EA 720. 19.00 13,680.00 21.88 15,753.60 628.2 SAWED BITUMINOUS PAVEMENT LM 1,100. 3.50 3,850.00 6.56 7,216.00 645.3 EROSION STONE T 30. 35.00 1,050.00 24.32 729.60 645.531 SILT FENCE LM 3,100. 8.60 26,660.00 8.76 27,156.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 2,000.00 2,000.00 3,123.75 3,123.75 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 30. 50.00 1,500.00 15.75 472.50 13854 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA 1.5 2,600.00 3,900.00 4,856.25 7,284.38 647.1 HUMUS M3 300. 26.00 7,800.00 20.59 6,177.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 110.00 330.00 144.00 432.00 692. MOBILIZATION U 1. 25,663.00 25,663.00 16,771.00 16,771.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 1008. ALTERATIONS AND ADDITIONS AS NEEDED $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 1010.11 FUEL ADJUSTMENT DIESEL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 1010.12 FUEL ADJUSTMENT GASOLINE $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 $653,931.50 $689,295.62