THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: DUBLIN 13995 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: APRIL 29, 2004 SCOPE OF WORK: REPLACING BOX CULVERT AND ROADWAY WIDENING LOCATION: NH ROUTE 137 IN DUBLIN COMPLETION DATE: AUGUST 20, 2004 A RENAULD BROS., INC. 283 FORT BRIDGEMAN ROAD #2, VERNON, VT 05354 $ 229,485.00 B MOORES MARINE CONSTRUCTION CORP. 33 LITTLEWORTH RD., DOVER, NH 03840 $ 252,642.85 C FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 278,815.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 100. 2.00 200.00 1.19 119.00 5.00 500.00 203.1 COMMON EXCAVATION CY 435. 8.00 3,480.00 20.73 9,017.55 15.00 6,525.00 203.601 EMBANKMENT-IN-PLACE CY 20. 10.00 200.00 22.00 440.00 15.00 300.00 206.2 ROCK STRUCTURE EXCAVATION CY 30. 50.00 1,500.00 135.00 4,050.00 50.00 1,500.00 304.201 GRAVEL CY 270. 18.00 4,860.00 25.27 6,822.90 25.00 6,750.00 304.301 CRUSHED GRAVEL CY 175. 30.00 5,250.00 28.24 4,942.00 40.00 7,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 310. 100.00 31,000.00 89.04 27,602.40 85.00 26,350.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 4. 150.00 600.00 142.00 568.00 85.00 340.00 503.201 COFFERDAMS U 1. 60,000.00 60,000.00 63,308.00 63,308.00 75,000.00 75,000.00 520.0001 PRECAST CONCRETE BOX CULVERT (CONCRETE CLASS AAA) U 1. 35,000.00 35,000.00 53,384.00 53,384.00 75,000.00 75,000.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 500. 21.00 10,500.00 20.06 10,030.00 17.00 8,500.00 606.14531 BEAM GUARDRAIL (TERMINAL UNIT SPECIAL, 50 FT) U 4. 2,800.00 11,200.00 2,078.00 8,312.00 2,000.00 8,000.00 606.14533 BEAM GUARDRAIL FOR STORAGE (TERMINAL UNIT SPECIAL, 50 FT) U 2. 1,500.00 3,000.00 1,543.00 3,086.00 1,300.00 2,600.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 618.7 FLAGGERS HR 160. 25.00 4,000.00 21.37 3,419.20 20.00 3,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 9,038.00 9,038.00 15,000.00 15,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 2. 800.00 1,600.00 778.00 1,556.00 1,000.00 2,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 8. 10.00 80.00 6.00 48.00 5.00 40.00 13995 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.31 SINGLE DELINEATOR WITH POST EA 4. 30.00 120.00 30.00 120.00 25.00 100.00 628.2 SAWED BITUMINOUS PAVEMENT LF 40. 5.00 200.00 3.00 120.00 10.00 400.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 1,920. 1.00 1,920.00 .59 1,132.80 .50 960.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) SY 55. 10.00 550.00 2.00 110.00 10.00 550.00 645.531 SILT FENCE LF 825. 3.00 2,475.00 1.56 1,287.00 1.00 825.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 3,500.00 3,500.00 4,155.00 4,155.00 1,000.00 1,000.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 20. 100.00 2,000.00 12.00 240.00 100.00 2,000.00 646.317 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS, AND HUMUS SY 625. 6.00 3,750.00 8.12 5,075.00 3.00 1,875.00 670.101 TEMPORARY LIGHTING U 1. 2,500.00 2,500.00 5,936.00 5,936.00 7,500.00 7,500.00 692. MOBILIZATION U 1. 20,000.00 20,000.00 23,724.00 23,724.00 20,000.00 20,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 $229,485.00 $252,642.85 $278,815.00