Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
November 27, 2013
Contacts:
Andrew Hall
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs on NH Route 3A in Bridgewater
Occasional Daily Lane Closures Can Be Expected

The New Hampshire Department of Transportation announces work is scheduled to begin on Monday, December 2, 2013 on bridge repairs on NH Route 3A in Bridgewater.

This concrete culvert bridge over a brook is located on NH 3A just south of Whittemore Point Road. Repairs are expected to take two and a half months to complete and will require periodic daily lane closures. The minimum lane width will be 16 feet.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire