Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
August 19, 2013
Contacts:
Andy Hall
August 19, 2013
Bridge Maintenance Bureau
(603) 271-3667
Public Information Office
(603) 271-6495
Bridge Repairs on NH Route 175 in Campton
Alternating Traffic Over Beebe River for 8 Weeks

The New Hampshire Department of Transportation (NHDOT) announces bridge repairs are planned on the NH Route 175 bridge over Beebe River in Campton.

Beginning the week of September 3, 2013, work will include replacing a deteriorated concrete rail on the north side of the bridge, as well as some concrete patching. Concrete barrier will be used to close off the northbound lane over the bridge.

Alternating one-way traffic will be controlled by temporary signals for approximately eight weeks. The single lane will be restricted to 12 feet in width.

Motorists using this bridge during September and October can expect brief delays.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire