Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
July 30, 2013
Contacts:
Steve Johnson
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs on NH Route 106 in Loudon
Traffic Lane Shift Over Soucook River

The New Hampshire Department of Transportation (NHDOT) announces bridge repair work is beginning today on the NH Route 106 bridge over the Soucook River in Loudon.

This bridge deck patching work is expected to take six weeks to complete and will require a lane shift in order to complete the work. Signs and barrels will be used to alert motorists and guide them through the work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire