Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
June 18, 2013
Contacts:
Steve Johnso
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Webster Bridge Repairs Will Require Single Lane Traffic
Tyler Road Bridge Over Blackwater River

The New Hampshire Department of Transportation (NHDOT) announces bridge repairs are scheduled to begin June 25th on the Tyler Road Bridge over Blackwater River in Webster.

This bridge deck rehabilitation project will require single lane (10') alternating traffic controlled by Stop and Yield signs for eight weeks. Motorists are urged to proceed with caution while driving through the work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire