Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
January 28, 2013
Contacts:
Andy Hall
Bridge Maintenance
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs on NH 116 Over Reel Brook in Easton
Will Require Single Lane Traffic for Three Months

The New Hampshire Department of Transportation (NHDOT) announces repair work is scheduled to begin Wednesday, January 30, on the NH Route 116 Bridge over Reel Brook in Easton.

This bridge deck replacement project is expected to take three months to complete and will require single lane (13 feet) alternating traffic controlled by either stop and yield signs or temporary signals, depending on the phase of work.

Built in 1928, this is a State "Red List" bridge that is inspected twice a year.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire