Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
December 12, 2012
Contacts:
Steve Johnson
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs On NH Route 32 In Swanzey
Single Lane Traffic For Four Months

The New Hampshire Department of Transportation (NHDOT) announces bridge repair work is scheduled to begin December 21st on the NH Route 32 bridge over Martin Brook in Swanzey.

This bridge deck replacement project is expected to take four months to complete. It will require single lane traffic across the bridge controlled by stop and yield signs. Motorists should proceed with caution when driving through this work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire