Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
October 23, 2012
Contacts:
Steve Johnson
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs on NH Route 175 in Woodstock
Single Lane Traffic Over for Six Weeks

The New Hampshire Department of Transportation announces bridge repairs are scheduled to begin Monday, November 5, 2012 on the NH Route 175 bridge over the Pemigewasset River in Woodstock.

This bridge deck work will require six weeks of single lane (9 foot wide) traffic controlled by temporary signals.

Electronic message boards will be used to alert motorists to the work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire