Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
September 11, 2012
Contacts:
Alan Hanscom
District 2 Highway Maintenance
(603) 448-2654
Public Information Office
(603) 271-6495
Main Street Drainage Repairs In Newport
Central St. To The Main St. Bridge Over The Sugar River

The New Hampshire Department of Transportation (NHDOT) announces drainage repairs are scheduled to begin on Monday, September 17, 2012 in Newport on the east side of Main Street (NH Routes 10/11/103) from Central Street south to the bridge carrying Main Street over the Sugar River.

This work is required because of a failed catch basin and carrying pipe. It is anticipated the work will require up to five days, weather permitting.  Two-way traffic will be maintained by shifting the traffic.  Possible delays should be expected.

The NHDOT’s Highway Maintenance District 2, along with Morrill Construction Company, Inc., of Pembroke, New Hampshire will be performing the work for this estimated $15,500 project.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire