Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
April 26, 2012
Contacts:
Doug Gosling
Bridge Maintenance Bureau
(603) 271-3667
Public Information Office
(603) 271-6495
Bridge Repairs on NH Route 10 in Haverhill
Single Lane Traffic Over Oliverian Brook

The New Hampshire Department of Transportation (NHDOT) announces bridge repairs are scheduled to begin on Monday, April 30 on the NH Route 10 bridge over Oliverian Brook in Haverhill.

This work involves the replacement of concrete bridge rail and will require single lane (14 feet wide) traffic controlled by temporary signals for three months.

Motorists are urged to proceed with caution when driving through this work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire