Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
March 19, 2012
Contacts:
Doug Gosling
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs On NH Route 26 In Colebrook
Single Lane Traffic Over Mohawk River For 5 Weeks

The New Hampshire Department of Transportation announces bridge repairs are scheduled to begin today (March 19) on the NH Route 26 bridge over Mohawk River in Colebrook.

This bridge repair work is expected to take five weeks to complete and will require single lane (14 feet wide) traffic over the bridge controlled by temporary signals on each end of the bridge. Motorists are advised to proceed with caution when traveling through this work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire