Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
October 7, 2011
Contacts:
Doug Gosling
Bridge Maintenance Bureau
(603) 271-2571
Bill Boynton
Public Information Office
(603) 271-6495
Interstate 89 Bridge Repairs at Exit 1 in Bow
Restricted Lane Width For Three Weeks

Bridge repairs are scheduled to take place on the Interstate 89 Exit 1 northbound off-ramp over the Turkey River in Bow. The deck maintenance work will include patching the existing concrete deck, installing new barrier membrane, and paving.

These bridge repairs will begin on Tuesday, October 18 and continue until Thursday, November 10, 2011. In order to perform the work, lane width restrictions will be in place throughout the three-week period. Motorists are advised to use caution when driving through this work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire