Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
April 22, 2011
Contacts:
Doug Gosling
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs On Parade Road In Barnstead
Single Lane Traffic Over Suncook River For 3 Weeks

The New Hampshire Department of Transportation announces bridge repair work is underway on the Parade Road Bridge over the Suncook River in Barnstead.

This bridge pier repair work is expected to take three weeks to complete and will require single lane traffic controlled by Stop and Yield signs. Motorists are asked to proceed with caution when driving through the work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire