|
RAMP PAVING AT NH ROUTE 101/111 INTERCHANGE IN EXETER AND HAMPTON
The New Hampshire Department of Transportation announces scheduled final paving work is scheduled to take place Wednesday, September 6, on sections of NH Route 111 and the ramps at the NH Route 101/Route 111 interchange in Exeter and Hampton. This paving work will require intermittant traffic delays. Motorists using this interchange are asked to allow for additional travel time on September 6 or take alternative routes if possible. R.S. Audley Construction, Inc., of Bow, New Hampshire, is the general contractor for the $2,429,827 project, which includes the westbound Route 101 bridge over NH 111, and ramp widening. |
|
|
Main Address:
John O. Morton Building 1 Hazen Drive Concord, NH 03302-0483 Telephone:
|