Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
March 12, 2014
Contacts:
Steve Johnson
Bridge Maintenance Bureau
(603) 271-3667
Public Information Office
(603) 271-6495
Bridge Repairs on NH Route 101 in Hampton
Traffic Change Over Drakeside Road for 2 Months

The New Hampshire Department of Transportation announces bridge repairs are scheduled to begin April 1 on the NH Route 101 bridge over Drakeside Road in Hampton.

This bridge deck repair work will require a traffic pattern change for approximately two months. Route 101 westbound traffic will have one 12-foot wide travel lane over the bridge. Eastbound traffic on NH 101 will also have one 12-foot lane over the bridge, then exit on US 1 southbound for a short signed detour.

This work is expected to be completed by May 23, 2014.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire