Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
January 21, 2013
Contacts:
Andrew Hall
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repairs on NH Route 26 in Errol
12 Week Project Will Require Alternating One-Way Traffic

The New Hampshire Department of Transportation (NHDOT) announces bridge repairs are scheduled to begin Monday, January 27, 2014 on the NH Route 26 bridge over Corser Brook in Errol.

This bridge deck repair project is expected to take 12 weeks to complete and will require one-way alternating traffic controlled by temporary signals. The travel lane on the bridge will be 13 feet wide during this period.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire