Project Name
(click project to view file) |
State
Project No. |
Federal
Project No. |
Bid Open |
Scope of Work |
| Albany |
13632-B |
X-A000(190) |
4/13/2006 |
NH 112, Roadway rehabilitation and shoulder widening |
| Alstead |
14541-G |
|
5/18/2006 |
NH 123, Design, manufacture and deliver 1 precast concrete box culvert |
| Alstead |
14541-H |
X-A000(471) |
6/8/2006 |
NH 123, Install culvert & reconstruct roadway |
| Bath-Landaff |
13427 |
|
12/7/2006 |
US 302 & NH 10, Guardrail upgrade & other related work |
| Bartlett |
13043 |
BRF-MGS-X-0321(023) |
10/4/2006 |
US 302, Replace bridge over NHRR & over the Saco River |
| Bedford |
10018-F |
STP-X-5037(008) |
3/2/2006 |
US 3, Landscaping Kilton Road & associated areas |
| Bedford-Manchester-Londonderry |
11512-E |
A000(203) |
5/8/2006 |
Airport access road, building demolition on airport property |
| Bedford-Manchester-Londonderry |
11512-M |
X-A000(468) |
7/6/2006 |
NH 3A & South River Road, building demolitions |
| Belmont |
12916 |
STP-X-T-0291(012) |
9/21/2006 |
US3/NH11, reconstruction & widening |
| Bow |
13714 |
|
12/21/2006 |
Grandview Road, Bridge rehabilitation over I-93/FEE TPK |
| Canaan-Dorchester |
14478 |
|
3/30/2006 |
NH 118, pavement rehabilitation and drainage upgrades |
| Candia-Hooksett |
14703 & 14625 |
X-A000(491) |
10/5/2006 |
Slope Stabilization, NH 101 |
| Claremont-Newport |
10433 |
MGS-STP-NHS-F-X-T-0141(023) |
8/11/2006 |
NH 11 & 103, Reconstruct from urban compact line to Kelleyville Bridge |
| Colebrook |
P2493-C |
BRS-RS-X-0201(007) |
9/28/2006 |
NH 26, Widening and road reconstruction & bridge replacement |
| Concord-Canterbury |
14283 |
X-A000(279) |
3/16/2006 |
I-93, Pavement & bridge work from Exit 17 to 18 |
| Gorham |
14204 |
X-A000(238) |
4/6/2006 |
NH 16, pavement rehabilitation and safety work |
| Hampton-Hooksett |
80268-R & 14630 |
|
9/14/2006 |
Re-roof toll plaza canopies and administration buildings |
| Hanpton-Portsmouth-Dover-Rochester |
14522 |
|
4/4/2006 |
I-95, resurfacing from Sherburne Road to Spaulding Turnpike |
| Hillsborough-Henniker |
14447 |
X-A000(387) |
5/11/2006 |
US 202/NH 9, Pavement rehabilitation and roadway work |
| Hooksett |
13715 |
|
3/30/2006 |
Pine Street, bridge rehabilitation over I-93/F.E.E.T. |
| Hopkinton/Warner/Sunapee/Lebanon |
14608 |
X-A000(465) |
6/22/2006 |
I-89 Crack seal Exit 5 north 6.5 miles to Exit 7 & at Exit 12A north |
| Hudson-Londonderry |
13743 |
|
1/5/2006 |
NH 102, West Road and Robinson intersection improvements |
| Keene-Milford |
13856 |
X-A000(061) |
3/9/2006 |
NH 101, upgrade guardrail & terminal units |
| Keene-Swanzey |
10309H & 10309O |
A000(281) & A000(457) |
10/5/2006 |
NH 9/10/12/101, intersection improvements |
| Lincoln |
13334-A |
X-A000(462) |
4/20/2006 |
NH 112, Paving and guardrail work |
| Livermore-Albany |
14512 |
X-A000(475) |
12/5/2006 |
NH112, Replace existing guardrail |
| Manchester-Concord |
14099-A |
|
5/8/2006 |
I-93 & I-293, Replace signs & 3 overhead sign structures |
| Meredith |
11386 |
F-X-0291(011) |
9/14/2006 |
US 3, Widen and construct a roundabout at the Parade Road intersection |
| Milton |
14660 |
|
7/27/2006 |
NH 16, Slope and drainage repairs |
| Monroe, NH-Barnet, VT |
14095 |
A000(336) |
1/26/2006 |
Bridge rehabilitation over the Connecticut River |
| Nashua-Merrimack-Hooksett |
14507 |
|
4/5/2006 |
FE Everett Tpk, resurfacing between exits 4 & 5 |
| New London to Enfield |
14255 |
X-A000(261) |
3/2/2006 |
I-89, Update signing from Exit 14 to Exit 12 |
| Portsmouth-Milton |
14232 |
|
3/30/2006 |
Spaulding Turnpike & I-95, install emergency reference markers |
| Resurfacing District 1 |
14581 |
|
4/4/2006 |
Counties of Coos, Carroll & Grafton |
| Resurfacing District 2 |
14582 |
|
4/5/2006 |
Counties of Grafton, Merrimack & Sullivan |
| Resurfacing District 3 |
14583 |
|
4/6/2006 |
Counties of Belknap, Gragton & Merrimack |
| Resurfacing District 4 |
14584 |
|
4/4/2006 |
Counties of Cheshire, Hillsboro & Sullivan |
| Resurfacing District 5 |
14585 |
|
4/6/2006 |
Counties of Hillsborough, Merrimack & Rockingham |
| Resurfacing District 6 |
14586 |
|
4/5/2006 |
Counties of Merrimack, Strafford & Rockingham |
| Salem to Manchester |
10418-I |
A000(210) |
9/21/2006 |
I-93, Construct park & ride @ Exit 5 (Londonderry) |
| Salem to Manchester |
13933-B |
A000(122) |
10/12/2006 |
I-93, Replace Cross Street bridge & approaches |
| Salem-Manchester & Plaistow-Kingston |
10418-S & 10044-J |
X-A000(481) |
11/2/2006 |
Building demolitions |
| Statewide crack seal |
14595 |
X-A000(455) |
5/18/2006 |
Crack seal roads in the 2001 resurfacing program |
| Statewide |
14480 |
|
7/13/2006 |
Snow fence installation on various bridges in District 1 |
| Stratham-Epping-Lee |
14452 |
X-A000(392) |
5/8/2006 |
NH 125, Pavement rehabilitation and roadway work |
| Sullivan-Stoddard |
14599 |
X-A000(459) |
5/4/2006 |
NH 9, Pavement rehabilitation and roadway work |
| Sutton |
14328-A |
A000(322) |
3/23/2006 |
I-89 southbound, remedial rock work |
| Turnpike guardrail repairs |
14628 |
|
7/20/2006 |
guardrail repairs |
| Winchester |
14360 |
|
3/9/2006 |
NH 10, replace existing span wire signal system |
| Woodstock-Lincoln |
14361 |
|
5/4/2006 |
I-93, Exit 32, replace existing traffic signals |